{"id":7805,"date":"2019-12-30T09:26:50","date_gmt":"2019-12-30T08:26:50","guid":{"rendered":"https:\/\/www.sustainable-bus.com\/?p=7805"},"modified":"2019-12-30T09:27:45","modified_gmt":"2019-12-30T08:27:45","slug":"irizar-e-mobility-delivered-two-ie-bus-in-portugal","status":"publish","type":"post","link":"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/","title":{"rendered":"Irizar e-mobility delivered two ie bus in Portugal"},"content":{"rendered":"

Irizar e-mobility<\/strong> delivered electric buses in Portugal for the first time. Both the\u00a010.8 metre Irizar ie bus zero emissions electric buses are already in operation in the city of Bragan\u00e7a. Today, the Spanish brand is present in more than 7 countries. The Irizar ie bus range has been recently updated<\/a>.<\/p>\n\"irizar\n

Irizar technology for the Portuguese ebuses<\/h2>\n

The two buses, model Irizar ie bus with a lenght of 10.8 meter, have\u00a02 double doors and 28 seats. They can carry up to 76 passengers<\/strong>. With a range of 220 km (stated by the manufacturer) and 350 kWh loaded energy<\/strong>, these vehicles are charged at night in 3-4 hours using interoperable chargers with Combo 2 charging sockets.<\/p>\n

The batteries included with the vehicles are developed and manufactured at Irizar e-mobility Aduna facilities in Guip\u00fazcoa and they meet the latest European regulations for electrical, thermal and mechanical safety (R100.v2, R10.v5 and UN38.3), Irizar points out.<\/p>\n

Both the electronics and the communications, which are main systems for the vehicle, are the outcome of Irizar Group technology.<\/p>\n

The city of Bragan\u00e7a is moving forward with its strategy of implementing sustainable urban mobility. And by adding the two Irizar ie buses to its fleet it will save 27,550 Euros in fossil fuels<\/strong> and reduce CO2 emissions by 58 tons a year, says Irizar in a press release.<\/p>\n\"irizar\n

The new Irizar ie bus presented in Brussels<\/h2>\n

Among the novelties of the new generation of the zero emission bus we can mention the reduction of weight, the increased passenger capacity and new generation batteries (whose details have not been specified) that promise greater range thanks also to the braking regeneration system. The vehicle was presented at Busworld Europe exhibition in Brussels<\/a>.<\/p>\n

The new Irizar ie bus range is\u00a0available 10, 12, 15 and 18-meter version<\/strong> and, likewise the ie tram range, is built in Irizar e-mobility plant in Aduna. Last year the Irizar ie bus have been awarded a ten-units order from Luxembourg<\/a>. In 2019 Irizar delivered as many as 43 electric buses (Irizar ie tram) to Keolis for a new BRT line in Amiens<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"

Irizar e-mobility delivered electric buses in Portugal for the first time. Both the\u00a010.8 metre Irizar ie bus zero emissions electric buses are already in operation in the city of Bragan\u00e7a. Today, the Spanish brand is present in more than 7 countries. The Irizar ie bus range has been recently updated. Irizar technology for the Portuguese […]<\/p>\n","protected":false},"author":11,"featured_media":7807,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[333],"tags":[],"acf":[],"yoast_head":"\nIrizar e-mobility delivered two ie bus in Portugal - Sustainable Bus<\/title>\n<meta name=\"description\" content=\"Irizar e-mobility delivered electric buses in Portugal for the first time. Both the\u00a010.8 metre Irizar ie bus zero emissions electric buses are already\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Irizar e-mobility delivered two ie bus in Portugal - Sustainable Bus\" \/>\n<meta property=\"og:description\" content=\"Irizar e-mobility delivered electric buses in Portugal for the first time. Both the\u00a010.8 metre Irizar ie bus zero emissions electric buses are already\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/\" \/>\n<meta property=\"og:site_name\" content=\"Sustainable Bus\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/sustainable.bus\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-12-30T08:26:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-12-30T08:27:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.sustainable-bus.com\/wp-content\/uploads\/2019\/12\/IMG_8473.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1536\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Editorial staff\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Editorial staff\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/\",\"url\":\"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/\",\"name\":\"Irizar e-mobility delivered two ie bus in Portugal - Sustainable Bus\",\"isPartOf\":{\"@id\":\"https:\/\/www.sustainable-bus.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.sustainable-bus.com\/wp-content\/uploads\/2019\/12\/IMG_8473.jpeg\",\"datePublished\":\"2019-12-30T08:26:50+00:00\",\"dateModified\":\"2019-12-30T08:27:45+00:00\",\"author\":{\"@id\":\"https:\/\/www.sustainable-bus.com\/#\/schema\/person\/ff37470bb15f5b48239c2de4fa42933e\"},\"description\":\"Irizar e-mobility delivered electric buses in Portugal for the first time. Both the\u00a010.8 metre Irizar ie bus zero emissions electric buses are already\",\"breadcrumb\":{\"@id\":\"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/#primaryimage\",\"url\":\"https:\/\/www.sustainable-bus.com\/wp-content\/uploads\/2019\/12\/IMG_8473.jpeg\",\"contentUrl\":\"https:\/\/www.sustainable-bus.com\/wp-content\/uploads\/2019\/12\/IMG_8473.jpeg\",\"width\":2048,\"height\":1536,\"caption\":\"irizar e-mobility portugal\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.sustainable-bus.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Irizar e-mobility delivered two ie bus in Portugal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.sustainable-bus.com\/#website\",\"url\":\"https:\/\/www.sustainable-bus.com\/\",\"name\":\"Sustainable Bus\",\"description\":\"Electric bus, alternative fueled bus and sustainable public transport systems\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.sustainable-bus.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.sustainable-bus.com\/#\/schema\/person\/ff37470bb15f5b48239c2de4fa42933e\",\"name\":\"Editorial staff\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.sustainable-bus.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/0de5c7eac5a942103cfaed95f2a31156?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/0de5c7eac5a942103cfaed95f2a31156?s=96&d=mm&r=g\",\"caption\":\"Editorial staff\"},\"url\":\"https:\/\/www.sustainable-bus.com\/author\/riccardo-schiavo\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Irizar e-mobility delivered two ie bus in Portugal - Sustainable Bus","description":"Irizar e-mobility delivered electric buses in Portugal for the first time. Both the\u00a010.8 metre Irizar ie bus zero emissions electric buses are already","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/","og_locale":"en_US","og_type":"article","og_title":"Irizar e-mobility delivered two ie bus in Portugal - Sustainable Bus","og_description":"Irizar e-mobility delivered electric buses in Portugal for the first time. Both the\u00a010.8 metre Irizar ie bus zero emissions electric buses are already","og_url":"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/","og_site_name":"Sustainable Bus","article_publisher":"https:\/\/www.facebook.com\/sustainable.bus\/","article_published_time":"2019-12-30T08:26:50+00:00","article_modified_time":"2019-12-30T08:27:45+00:00","og_image":[{"width":2048,"height":1536,"url":"https:\/\/www.sustainable-bus.com\/wp-content\/uploads\/2019\/12\/IMG_8473.jpeg","type":"image\/jpeg"}],"author":"Editorial staff","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Editorial staff","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/","url":"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/","name":"Irizar e-mobility delivered two ie bus in Portugal - Sustainable Bus","isPartOf":{"@id":"https:\/\/www.sustainable-bus.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/#primaryimage"},"image":{"@id":"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/#primaryimage"},"thumbnailUrl":"https:\/\/www.sustainable-bus.com\/wp-content\/uploads\/2019\/12\/IMG_8473.jpeg","datePublished":"2019-12-30T08:26:50+00:00","dateModified":"2019-12-30T08:27:45+00:00","author":{"@id":"https:\/\/www.sustainable-bus.com\/#\/schema\/person\/ff37470bb15f5b48239c2de4fa42933e"},"description":"Irizar e-mobility delivered electric buses in Portugal for the first time. Both the\u00a010.8 metre Irizar ie bus zero emissions electric buses are already","breadcrumb":{"@id":"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/#primaryimage","url":"https:\/\/www.sustainable-bus.com\/wp-content\/uploads\/2019\/12\/IMG_8473.jpeg","contentUrl":"https:\/\/www.sustainable-bus.com\/wp-content\/uploads\/2019\/12\/IMG_8473.jpeg","width":2048,"height":1536,"caption":"irizar e-mobility portugal"},{"@type":"BreadcrumbList","@id":"https:\/\/www.sustainable-bus.com\/electric-bus\/irizar-e-mobility-delivered-two-ie-bus-in-portugal\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.sustainable-bus.com\/"},{"@type":"ListItem","position":2,"name":"Irizar e-mobility delivered two ie bus in Portugal"}]},{"@type":"WebSite","@id":"https:\/\/www.sustainable-bus.com\/#website","url":"https:\/\/www.sustainable-bus.com\/","name":"Sustainable Bus","description":"Electric bus, alternative fueled bus and sustainable public transport systems","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.sustainable-bus.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.sustainable-bus.com\/#\/schema\/person\/ff37470bb15f5b48239c2de4fa42933e","name":"Editorial staff","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sustainable-bus.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/0de5c7eac5a942103cfaed95f2a31156?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0de5c7eac5a942103cfaed95f2a31156?s=96&d=mm&r=g","caption":"Editorial staff"},"url":"https:\/\/www.sustainable-bus.com\/author\/riccardo-schiavo\/"}]}},"_links":{"self":[{"href":"https:\/\/www.sustainable-bus.com\/wp-json\/wp\/v2\/posts\/7805"}],"collection":[{"href":"https:\/\/www.sustainable-bus.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sustainable-bus.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sustainable-bus.com\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sustainable-bus.com\/wp-json\/wp\/v2\/comments?post=7805"}],"version-history":[{"count":0,"href":"https:\/\/www.sustainable-bus.com\/wp-json\/wp\/v2\/posts\/7805\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sustainable-bus.com\/wp-json\/wp\/v2\/media\/7807"}],"wp:attachment":[{"href":"https:\/\/www.sustainable-bus.com\/wp-json\/wp\/v2\/media?parent=7805"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sustainable-bus.com\/wp-json\/wp\/v2\/categories?post=7805"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sustainable-bus.com\/wp-json\/wp\/v2\/tags?post=7805"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}